Multiple Choice
-A quality manager has established a sampling plan that calls for a sample size of 100 units and an acceptance number of 2.The supplier has agreed to a contract that calls for an AQL of 0.01 and an LTPD of .05.Which of the following statements is TRUE? Table I.1 is appended to this exam.
A) Lowering the acceptance number to 1 will raise the probability of a type II error.
B) Increasing the sample size will increase ?.
C) Raising the AQL to 0.02 will lower the chance of a type I error.
D) Reducing the LTPD to 0.04 will reduce the chance of a type II error.
Correct Answer:

Verified
Correct Answer:
Verified
Q2: A sequential sampling plan generally lowers the
Q20: Increasing c while holding n constant decreases
Q41: A double-sampling plan has n₁ = 50,
Q43: A small _ can be disregarded in
Q49: The distance between 1.0 and where the
Q61: The average outgoing quality (AOQ) is:<br>A) the
Q61: Which of the following statements is TRUE?<br>A)
Q63: A manufacturer wants a sampling plan in
Q67: Acceptable quality level can be defined as
Q68: A sample of 100 items is randomly