Multiple Choice
Which of these drawbacks would be considered a hidden cost of work standards?
A) Assigning tasks to workers and machines to utilize resources
B) Increased conflict between labor and management
C) Ability to compare alternative process designs
D) Determination of current and projected capacity requirements
Correct Answer:

Verified
Correct Answer:
Verified
Q16: Time studies are appropriate for setting time
Q71: Special training is required for observers using
Q74: With a time study approach, the:<br>A) nature
Q88: Which work-measurement technique breaks down tasks into
Q95: A worker was observed for four
Q96: A time-study analyst is determining the standard
Q96: Compare and contrast the method of time
Q100: The advantage of using the predetermined data
Q108: An advantage of the elemental standard data
Q167: Work sampling is most often used in