Multiple Choice
A time-study analyst is attempting to determine the standard time for a work element.She or he observes a worker performing the work element at a higher-than-average pace.How will this fact be reflected in the time standard that is eventually created?
A) The frequency of the work element per cycle will be increased.
B) The proportion of allowance time will be increased above 1.0.
C) The performance rating factor will be set greater than 1.0.
D) The normal time for the work element will be increased.
Correct Answer:

Verified
Correct Answer:
Verified
Q3: Which one of the following statements about
Q24: When using the MTM approach:<br>A) stopwatches are
Q44: A worker was observed for four
Q46: Keith assembles peanut valves and the
Q48: The method used most often for setting
Q49: The more frequently the activity occurs, the
Q50: Which one of the following statements about
Q64: Explain why a sampling schedule is important
Q89: Using the _,the analyst divides each work
Q92: A predetermined data approach to time standards