Multiple Choice
At a new watch assembly plant,a job is divided into three work elements.The element times for the first four cycles are recorded by the continuous method and are presented below along with a performance rating factor (RF) for each element.
The standard time for this job,assuming that the allowance is 18 percent,is
A) fewer than or equal to 1.9 minutes.
B) greater than 1.9 minutes but fewer than or equal to 2.0 minutes.
C) greater than 2.0 minutes but fewer than or equal to 2.1 minutes.
D) greater than 2.1 minutes.
Correct Answer:

Verified
Correct Answer:
Verified
Q23: Work sampling can be used to estimate
Q50: How can work standards be developed for
Q63: <span class="ql-formula" data-value="\begin{array} { | c |
Q64: An observer has recorded the following
Q66: An industrial engineer is conducting a time
Q69: Work standards would NOT be helpful for
Q70: When a work analyst needs a high
Q71: <span class="ql-formula" data-value="\begin{array} { | c |
Q73: A worker was observed for four
Q170: Fatigue,rest,or unavoidable delays are factored into a