High Tech, Inc. is producing two types of products: A and B. Both are produced at the same sawing operation. Because of demand uncertainties, the operations manager obtained three demand forecasts (pessimistic, expected, and optimistic) . The demand forecasts, batch sizes (units/batch) , processing times (hr/unit) , and setup times (hr/batch) follow.
The sawing machines operate on two 8-hour shifts, 5 days per week, and 50 weeks per year. The manager wants to maintain a 10 percent capacity cushion.
-Using the information from Table 4.2,what is the minimum total number of hours required of sawing equipment for the next year?
A) less than 85,000 hours
B) more than 85,000 but less than 95,000
C) more than 95,000 but less than 105,000
D) more than 105,000 hours
Correct Answer:

Verified
Correct Answer:
Verified
Q4: is any stock of items used to
Q55: Capacity is the maximum rate of output
Q68: Table 4.1<br>The Union Manufacturing Company is
Q68: Setup time is the time required to
Q69: What is the capacity cushion and how
Q69: Which one of the following is NOT
Q72: Managers of line flow process facilities with
Q111: Utilization is the degree to which equipment,
Q127: Wait time is not part of the
Q128: _ capacity is the maximum output that