Table 4.2
High Tech, Inc. is producing two types of products: A and B. Both are produced at the same sawing operation. Because of demand uncertainties, the operations manager obtained three demand forecasts (pessimistic, expected, and optimistic) . The demand forecasts, batch sizes (units/batch) , processing times (hr/unit) , and setup times (hr/batch) follow.

 Time Standard  Demand Forecasts ( 000 units/yr)   Product  Processing  Setup  Batch Size  Pessimistic  Expected  Optimistic  A .202.040200240300 B .153.050160180200\begin{array}{c}\quad\quad\quad\quad\quad\text { Time Standard } \quad\quad \quad\quad\quad\quad\quad \text { Demand Forecasts ( 000 units/yr) }\\\begin{array}{|l|l|l|l|l|l|l|}\hline \text { Product } & \text { Processing } & \text { Setup } & \text { Batch Size } & \text { Pessimistic } & \text { Expected } & \text { Optimistic } \\\hline \text { A } & .20 & 2.0 & 40 & 200 & 240 & 300 \\\text { B } & .15 & 3.0 & 50 & 160 & 180 & 200 \\\hline\end{array}\end{array}
The sawing machines operate on two 8-hour shifts, 5 days per week, and 50 weeks per year. The manager wants to maintain a 10 percent capacity cushion.
-Using the information from Table 4.2,if the operation currently has 18 machines and the manager is willing to expand capacity by 20 percent through short-term options,what is the capacity gap (in terms of number of machines) if you assume the optimistic demand forecasts?


A) less than or equal to 10
B) more than 10 but less than or equal to 12
C) more than 12 but less than or equal to 14
D) more than 14