Multiple Choice
Table 9.12
A company with a process layout wants to rearrange its facility in the space available. There are six departments, and the flow among them is given in the following trip matrix. The shape and the size of the space available is also given. Assume rectilinear distances.
Trips Between Departments
Location Positions
-Use the information from Table 9.12.Consideration of safety and EPA regulations restrict the location of certain departments: Department A must be assigned to positions 1 or 4,Department D must be assigned to positions 4 or 6,Department E must be assigned to positions 1 or 3,and Department F must be assigned to positions 3 or 6.What is the least load-distance assignment of the departments to locations?
A)
B)
C)
D)
Correct Answer:

Verified
Correct Answer:
Verified
Q10: is the assignment of work to stations
Q13: Many projects use a fixed- position layout.
Q20: When volumes are high, generally an advantage
Q40: A(n) _ line is a product line
Q61: A company that assembles big airplanes or
Q64: Table 9.23<br>The Terminal Company is attempting
Q159: One of the advantages of building a
Q184: Line balancing is the assignment of work
Q200: One dominant factor in locating service facilities
Q215: The absolute location is the placement of