Multiple Choice
In a brick veneer assembly, weep holes are required
A) immediately above the flashing.
B) at each alternate floor level.
C) at each floor level.
D) 2 in. above a flashing.
E) immediately below the flashing.
Correct Answer:

Verified
Correct Answer:
Verified