Multiple Choice
In a tilt- up wall construction system, the walls are
A) precast in a plant and transported to the construction site for erection.
B) precast at the construction site.
C) cast in place at the construction site.
D) B or C, whichever is more economical.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q71: Where the cutting of masonry units is
Q72: An opening in a tilt- up wall
Q73: The formwork used in constructing site- cast
Q74: What is the purpose of bond beams,
Q75: the keyway between precast- concrete hollow- core
Q76: Which of the two masonry materials-CMU or
Q77: The concrete tilt- up wall construction system
Q79: Historical load- bearing masonry structures were designed
Q80: Explain why the typical thickness of tilt-
Q81: With the help of sketches and notes,