Question 31

Multiple Choice

A posttensioned (PT) concrete slab- on- ground foundation generally consists of


A) a PT slab, perimeter beams, and intermediate beams.
B) a PT slab only.
C) a PT slab and perimeter beams.
D) any one of the above, depending on the superimposed loads.
E) none of the above.

Correct Answer: