Multiple Choice
Of the various project delivery methods described in the text, the oldest method is
A) design- bid- build (DBB) method.
B) integrated project delivery (IPD) method.
C) design- build method (DB) method.
D) design- negotiate- build (DNB) method.
E) construction manager at risk (CMAR) method.
Correct Answer:

Verified
Correct Answer:
Verified