Multiple Choice
In the CMAR method of project delivery, the CM
A) advises the owner in the selection of the architect and the design team members.
B) advises the design team with respect to the constructability of design decisions and their cost implications.
C) works as the general contractor for the project.
D) only A and B
E) only B and C
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The predesign phase of the project comprises
Q2: The project manual includes the project's construction
Q3: The day- to- day supervision of construction
Q5: During a routine visit to the construction
Q6: Provide the spelled- out versions of the
Q7: Using a diagram, show the contractual relationships
Q8: Name at least three items of construction
Q9: Which design documentation technology allows the detection
Q10: Explain the benefits of the GC's preconstruction
Q11: The construction drawings of a building project