Multiple Choice
The project delivery method in which only one firm is contracted for both design and construction of the building is called the
A) CMAR method.
B) CMAA method.
C) IPD method.
D) design- bid- build method.
E) design- build method.
Correct Answer:

Verified
Correct Answer:
Verified