Jack Joyner, Director of Quality Control at Covington Castings (CC) , is designing a c chart to monitor the number of nonconformances per aluminum casting produced at CC.The total number of nonconformances for 26 castings is 91.The centerline for Jack's c chart is ___________.
A) 117.00
B) 0.2857
C) 3.50
D) 65.00
E) 26.00
Correct Answer:

Verified