Multiple Choice
An organisation's accountant is estimating next period's total overhead costs. She performed two regression analyses, one based on direct labour hours and the other based upon machine hours. The results were: Total overhead = $150,000 + $4 x direct labour hours
Adjusted R-square = 0.83
Total overhead = $130,000 + $5 x machine hours
Adjusted R-square = 0.77
For the next period the accountant anticipates using 28,000 direct labour hours and 26,000 machine hours. Based upon this information, what is the best estimate for overhead for the next period?
A) $262,000
B) $260,000
C) $254,000
D) $270,000
Correct Answer:

Verified
Correct Answer:
Verified
Q26: Regression analysis produces the most accurate results
Q27: Multiple methods of cost estimation techniques may
Q28: When graphing a cost function the intercept
Q29: Regression analysis removes errors in cost estimation
Q30: Total fixed costs vary with small changes
Q32: The two point method uses the highest
Q33: Scatter plots provide a visual technique for
Q34: Engineered estimates of costs can only be
Q35: Assuming that a cost is mixed and
Q36: Hifi Company wants to develop a