In ________ systems, capacity should be set at the level of ________, while in ________ systems, capacity should be set at the level of ________.
A) high-contact; peak demand; low-contact; average demand
B) low-contact; peak demand; high-contact; average demand
C) low-contact; peak demand; low-contact; average demand
D) high-contact; average demand; high-contact; peak demand
E) none of these
Correct Answer: