Multiple Choice
As per the Risk and Return evaluation matrix for Six Sigma projects,projects that are home runs have a
A) low risk factor and low return factor.
B) high risk factor and low return factor.
C) low risk factor and high return factor.
D) high risk factor and high return factor
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q36: When all departments are involved in process
Q37: Reducing waste in a methodical manner to
Q38: What is the N = 2 technique?
Q39: A lean method that gives employees the
Q40: The Japanese term for continuous improvement is
Q42: The Japanese term for continuous improvement is
Q43: As per the Risk and Return evaluation
Q44: Which of the following is not one
Q45: The card system used for controlling the
Q46: The defect rate in a Six Sigma