Multiple Choice
Which of the following is NOT TRUE based on Crosby's quality philosophy?
A) The only performance measure is the cost of quality.
B) There is no such thing as a quality problem.
C) Zero defects is an unrealistic goal.
D) Quality is free.
Correct Answer:

Verified
Correct Answer:
Verified
Q62: Crosby's Absolutes of Quality Management include the
Q63: The Malcolm Baldrige National Quality Award criteria
Q64: The European Quality Award,compared to the Baldrige
Q65: Companies have utilized the Malcolm Baldrige National
Q66: _,or doing the best for individual components,results
Q68: The second part of Profound Knowledge is
Q69: In 2005,Baldrige introduced the concept of _
Q70: Which of the following represents a point
Q71: Quality is defined as "conformance to requirements"
Q72: The term "total quality control" was originally