Multiple Choice
The s-chart is recommended when:
A) the control chart calculations needs to be performed by hand.
B) tight control of variability in the process is required.
C) the -chart is not associated with an R-chart.
D) the sample size for each sample needs to be reduced.
Correct Answer:

Verified
Correct Answer:
Verified