Multiple Choice
Imelda, a professor of management studies, wants to organize a collaborative project with her students to help them understand various aspects of marketing. She writes down the project goal in a circle in the center of a large sheet of paper. She and her students then brainstorm to identify the tasks that must be done to achieve the goal. She asks the students to write each task in a circle on the sheet and draw lines connecting the various circles. In this scenario, Imelda is using a process called _____.
A) Failure Mode and Effect Analysis (FMEA)
B) RACI matrix
C) hierarchal planning
D) mind mapping
E) contingency analysis
Correct Answer:

Verified
Correct Answer:
Verified
Q30: Duncan, a project manager, has to create
Q31: Renee, a project manager, is responsible for
Q32: Developing measures for the probability of the
Q33: In the Design Structure Matrix<br>A) the rows
Q34: A project champion is usually the senior
Q36: It is acceptable to restrict the launch
Q37: The manager of a project causes a
Q38: Taken together the RACI and the Work
Q39: Mind mapping is a whole-brain approach that
Q40: These are held at the beginning of