Conway Mountain Analysis offers agriculture and environmental assays. Its Soil Division performs testing on soil (S), as well as examines for the presence of pesticide residue (PR). Aggregated operating costs for the division are $1,050,000 based on a single overhead pool at a rate of $70 per testing hour. S testing uses 5,000 hours and PR uses 10,000 hours. The company is trying to determine whether a better costing structure can be established. The controller has identified the following costs:
(1) Salaries and wages of laboratory techs are $600,000 (based on 45% for S and 55% for PR testing).
(2) Equipment related overhead like depreciation, maintenance, utilities, and insurance amounts to $150,000, with a cost driver of number of test hours.
(3) Setup costs are $120,000 assigned based on 10,000 total setup hours. S testing requires 4,200 setup hours and PR testing requires 5,800 setup hours.
(4) Costs of test designs amount to $180,000, based on the time required to design the tests. S testing requires 3,250 hours and P testing requires 1,750 hours.
Required:
(a) Calculate the cost per test hour for S and PR using an improved costing system.
(b) Explain briefly the reasons why these costs are different from the $70 per test-hour under the current costing system.
Correct Answer:

Verified
Solution:
(b) The current costing syst...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q65: Flawless Cosmetic Company manufactures and distributes
Q66: What is the typical effect on
Q67: The electricity used for production machinery would
Q68: Russell Manufacturing Corporation has a traditional
Q69: The death spiral concept refers to the
Q71: The Mega Construction Company recently switched
Q72: The basic difference between a first-stage cost
Q73: Flawless Cosmetic Company manufactures and distributes
Q74: JamMaster Audio Corporation has a traditional
Q75: Harrison Industries has an activity-based costing