Multiple Choice
When using the beta probability distribution to estimate activity times, which of the following statements is TRUE?
A) The use of most optimistic, most likely, and most pessimistic times for an activity will result in a determination of the expected times for that activity.
B) The beta distribution is used as a way of approximating a normal probability distribution for time estimates.
C) The larger the difference between most pessimistic time and most optimistic time for an activity, the smaller the variance of that time estimate.
D) The project manager is usually the only person involved in making time estimates, since obtaining estimates from workers involved in the activities would result in inconsistent estimates.
Correct Answer:

Verified
Correct Answer:
Verified
Q28: What characteristics should project manager possess?
Q29: For controlling projects, the Schedule Performance Index
Q30: Crashing, or expediting, any activity within a
Q31: Describe what a work breakdown structure (WBS)
Q32: Discuss the importance of establishing the scope,
Q34: A(n) _ is an interrelated set of
Q35: The new service/product development process begins with
Q36: Scope creep refers to many small incremental
Q38: Deviations from the project plan are often
Q59: A Gantt chart is a project schedule