Multiple Choice
The central line on a p- chart is 0.50 with an UCL of 0.65 and a LCL of 0.35. The results of the next six samples are 0.60, 0.37, 0.45, 0.48, 0.53, and 0.62. What should you do?
A) Explore the assignable causes because three observations are above the central line.
B) Explore assignable causes because there is a run.
C) Increase the sample size to get a better measure.
D) Nothing; the process is behaving as expected.
Correct Answer:

Verified
Correct Answer:
Verified
Q17: The "hub" or centre of the TQM
Q18: The upper and lower specifications for a
Q19: _ is the application of statistical techniques
Q20: <span class="ql-formula" data-value="\begin{array}{l}\text { Table } 7.3\\\begin{array}
Q21: A hotel tracks the number of complaints
Q23: Once a process is in statistical control,
Q24: A new product has been designed with
Q25: _ costs result from defects that are
Q26: Continuous improvement is a philosophy that<br>A) ensures
Q27: A company is interested in monitoring