Demand for an item is 1000 units per week, with a standard deviation in weekly demand of 60 units. The lead time is 2 weeks. The company wants to maintain an 88 percent cycle- service level. Assume demand during lead time to be normally distributed. For a continuous review system, what should be the reorder point? A normal table is attached at the end of this exam.
A) less than or equal to 2075
B) greater than 2075 but less than or equal to 2085
C) greater than 2085 but less than or equal to 2095
D) greater than 2095
Correct Answer:

Verified
Correct Answer:
Verified
Q31: The Lemma Company manufactures and sells 10
Q34: The primary lever for reducing _ inventory
Q35: What are the secondary levers for anticipation
Q37: Holding inventory towards the finished goods level
Q38: For a continuous review (Q) inventory system,
Q39: _ systems are systems in which an
Q40: As the setup cost (S) increases, the
Q41: The economic order quantity (EOQ), is the
Q125: The two-bin inventory system is a type
Q126: A(n) _ is a system that allows