Multiple Choice
An assembly line has to perform 10 work elements, whose time requirements follow below. An operations analyst has found a solution using some heuristics. The solution follows below. Solution If the cycle time of the line is 90 seconds, what is the efficiency of the assembly line?
A) less than 85%
B) greater than 85% but less than 90%
C) greater than 90% but less than 95%
D) greater than 95%
Correct Answer:

Verified
Correct Answer:
Verified
Q55: Fun Vehicles, Inc. makes beach buggies on
Q140: Which one of the following is usually
Q141: Table 10.2<br>Durham Toy, Inc. has five
Q142: When volumes are high, an advantage of
Q144: Table 10.17<br>The Pennsylvania Appliance company is
Q146: Table 10.10<br>A firm of four departments
Q147: Good schools, recreational facilities, cultural events, and
Q148: In the fixed- position layout, the product
Q149: Table 10.6<br>Nuts-and-Bolts Inc. wishes to find
Q150: The transportation method is a quantitative approach