A line balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass, Inc. The desired output rate of 30 spreaders per hour will be achieved. The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled. This is the total productive time. Which of the following statements must be TRUE?
A) If the solution calls for 11 stations, the efficiency is 80%.
B) The "theoretical minimum" number of stations is 10.
C) If solution calls for 12 stations, the efficiency is 80%.
D) The cycle time is 30 seconds per spreader.
Correct Answer:

Verified
Correct Answer:
Verified
Q181: Explain what line balancing is and how
Q182: Table 10.20<br>The following information is known
Q183: Which one of the following statements about
Q184: Line balancing is the assignment of work
Q185: Which one of the following statements is
Q187: What is the definition of "theoretical maximum
Q188: _ involves decisions about the physical
Q189: The trip matrix and the current
Q190: A company that assembles big airplanes or
Q191: A grower and shipper of fresh