Multiple Choice
What is a potential consequence of not assessing and managing risks?
A) Inaccurate project duration estimates
B) Inaccurate project estimates
C) Failure to reach adequate system performance levels
D) All of the above
Correct Answer:

Verified
Correct Answer:
Verified