Essay
A manufacturing company has a pool of 50 labor hours. A customer has requested two products, Product A and Product B, and has requested 15 and 20 of each respectively. It requires 2 hours of labor to produce Product A and 3 hours of labor to produce Product B. The company can obtain up to 50 additional hours of labor if required. In-house labor costs $25 per hour while contracted labor costs $45 per hour. The following network flow model captures this problem.
Write out the LP formulation for this problem.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The number of constraints in network flow
Q23: A manufacturing company has a pool of
Q33: Supply quantities for supply nodes in a
Q42: Demand quantities for demand nodes in a
Q60: A trucking company wants to find the
Q61: A company needs to ship 100
Q62: Draw the network representation of the
Q63: An oil company wants to create
Q67: A company wants to determine the optimal
Q68: An oil company wants to create lube