Multiple Choice
In a minimum cost network flow model, the flow balance constraint for each demand node takes which form?
A) Net Outflow > Capacity
B) Net Inflow ≥ Demand
C) Net Inflow=0 (equivalent to Net Outflow=0)
D) Net Outflow ≤ Capacity
Correct Answer:

Verified
Correct Answer:
Verified