Essay
At a certain manufacturing plant, a machine produces ball bearings that should have a diameter of 0.500 mm. If the machine produces ball bearings that are either too small or too large, the ball bearings must be scrapped. Every hour, a quality control manager takes a random sample of 36 ball bearings to test to see if the process is "out of control" (i.e. to test to see if the average diameter differs from 0.500 mm). Assume that the process is maintaining the desired standard deviation of 0.06 mm. The results from the latest sample follow: At a .01 level of significance, use Excel to test whether the process is out of control.
Correct Answer:

Verified
Reject H0, .00002 < .01. The...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q36: In the hypothesis testing procedure, α is<br>A)
Q63: For a one-tailed test (upper tail) with
Q64: A two-tailed test is a hypothesis test
Q66: The academic planner of a university thinks
Q68: For each shipment of parts a manufacturer
Q69: The school's newspaper reported that the proportion
Q70: The board of directors of a corporation
Q71: A sample of 81 account balances of
Q72: A soft drink filling machine, when in
Q77: A Type I error is committed when<br>A)