The Most Likely Method to Assign the Cost of an Assembly-Line

Question 189

Multiple Choice

The most likely method to assign the cost of an assembly-line supervisor when the assembly line is the cost object is the:


A) driver tracing method
B) arbitration method
C) allocation method
D) direct tracing method

Correct Answer: