Attraction Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:
Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours. What is (are) the facility-level activity(ies) ?
A) set-ups
B) inspecting
C) providing space
D) both a and b
Correct Answer:

Verified
Correct Answer:
Verified
Q49: If activity-based costing is used, insurance on
Q185: A(n) _ is a grouping of logically
Q186: An _costing database is the collected data
Q187: Summer Manufacturing has four categories of
Q188: The activity-based cost assignment is the most
Q189: A(n) _ method first traces costs to
Q191: Overhead assignments should reflect the amount of
Q193: The Gardenview Corporation has identified the
Q194: Tandem Company manufactures two products (D
Q195: Marion Manufacturing uses an activity-based costing