Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
Owens produces two models: Model and Model Y. The following table shows how the two products consume activity.
First determine the overhead costs assigned to model D using the two most expensive activities for cost pools. The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs. (Round to two decimal places.) The engineering cost assigned to model D would be
A) $626,650.
B) $1,253,320.
C) $1,879,970.
D) $3,133,333.33.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Product i's total time used for all
Q2: Materials handling would be classified as a
Q4: The following information pertains to Whitestone
Q5: Carriage Manufacturing uses an activity-based costing
Q6: Predetermined overhead rates are calculated at the
Q7: The Fast & Furious Company produces
Q8: Appleby Manufacturing uses an activity-based costing
Q9: If activity-based costing is used, set-ups would
Q10: The nonfinancial and financial data that describe
Q11: The Wellness Clinic is considering a