Multiple Choice
Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
Owens produces two models: Model and Model Y. The following table shows how the two products consume activity.
Determine the engineering costs assigned to model C using the two most expensive activities for cost pools. The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs. (Round to two decimal places.) The engineering cost assigned to model C would be
A) $2,819,930
B) $1,566,666.67
C) $566,666.67
D) $313,330
Correct Answer:

Verified
Correct Answer:
Verified
Q46: If activity-based costing is used, setups would
Q53: The proportion of an overhead activity consumed
Q154: An activity-based costing system traces costs to
Q155: The Brookstone Company produces 9 volt
Q156: _ drivers create distortions when different products
Q157: Appleby Manufacturing uses an activity-based costing
Q158: Quasi-Tech Corporation produces specially machined parts.
Q160: Appleby Manufacturing uses an activity-based costing
Q161: The Molotov plant of Kaboom Industries
Q164: Healthy Solutions, Inc., is considering a