Multiple Choice
The document used by the lean control system that compares operational, capacity, and financial metrics with prior week performances and with a future desired state is called:
A) balanced scorecard
B) profit analysis worksheet
C) box scorecard
D) performance improvement plan
Correct Answer:

Verified
Correct Answer:
Verified