Multiple Choice
Figure 16-3
Harald, SA., has done a cost analysis for its production of bumper stickers. The following activities and cost drivers have been developed: Following are the actual costs of producing 85,000 stickers: 5,000 machine hours; 10 batches; 20 purchase orders
-Refer to Figure 16-3. What is the budget variance for total costs in an activity-based performance report?
A) £700 U
B) £700 F
C) £800 U
D) none of the above
Correct Answer:

Verified
Correct Answer:
Verified