Multiple Choice
Figure 11-2
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed: The costs of facility-level activities are assigned using machine hours.
-Refer to Figure 11-2. What is(are) the batch-level activity(ies) ?
A) engineering
B) setups
C) inspecting
D) all of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q6: More accurate product costing information is produced
Q46: If activity-based costing is used, setups would
Q47: Which of the following items would be
Q49: If activity-based costing is used, insurance on
Q50: Maintenance of the production equipment would be
Q52: If activity-based costing is used, product inspections
Q53: Figure 11-1<br>Ubben Manufacturing uses an activity-based
Q54: Which of the following items would be
Q55: Godwin Ltd. produces specially machined parts.
Q56: Which of the following quantities is an