Multiple Choice
Figure 11-2
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed: The costs of facility-level activities are assigned using machine hours.
-Refer to Figure 11-2. What is the cost pool overhead rate for the unit-level activities?
A) £80.00 per machine hour
B) £13,500.00 per setup
C) £17.20 per machine hour
D) £97.20 per machine hour
Correct Answer:

Verified
Correct Answer:
Verified
Q6: More accurate product costing information is produced
Q30: An activity-based costing system uses which of
Q39: Funk Manufacturing Company produces specially machined
Q41: Figure 11-2<br>Owens Ltd. produces specially machined
Q42: All of the following are nonunit-based activity
Q43: Figure 11-6<br>Peach, SA., has identified the
Q45: Flanigan Manufacturing uses an activity-based cost
Q46: If activity-based costing is used, setups would
Q47: Which of the following items would be
Q49: If activity-based costing is used, insurance on