Multiple Choice
Figure 11-2
Owens Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers: Activity drivers for each activity have been identified and their practical capacities listed: The costs of facility-level activities are assigned using machine hours.
-Refer to Figure 11-2. What is the cost pool rate for the product-level activities?
A) £80.00 per machine hour
B) £13,500.00 per setup
C) £17.20 per machine hour
D) none of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q2: Figure 11-2<br>Owens Ltd. produces specially machined
Q3: Activity-based costing assigns costs to cost object
Q4: Lyons, SA., has identified the following
Q5: An activity-based cost system<br>A)differs from a traditional-based
Q6: An example of a nonunit-level driver is<br>A)pounds
Q8: The overhead rates of the traditional-based approach
Q9: Figure 11-3<br>Moss Ltd. has the following
Q10: Hunter Company manufactures two products (XX
Q11: In an activity-based cost system, what types
Q12: An example of a production or unit-level