Multiple Choice
In applying costs using a predetermined overhead rate, the most common allocation base is generally
A) direct labour hours.
B) direct materials used.
C) indirect labour hours.
D) indirect materials used.
Correct Answer:

Verified
Correct Answer:
Verified