Using the following information, prepare a factory overhead cost budget for Jacob Company where the total factory overhead cost is $206,500 at normal capacity
(100%). Include capacity at 60%, 80%, 100%, and 120%. Total variable cost is $15.25 per unit, and total fixed costs are $54,000. The information is for the month ended October 31.
(Hint: Determine units produced at normal capacity.)