Everett, Inc. budgeted $1,488,000 for total overhead. The standard variable overhead rate was $2 per direct labour hour, or $6 per unit, based on an anticipated activity level of 600,000 direct labour hours. During the year 220,000 units were produced. Fixed overhead costs incurred were $300,000. The variable overhead budget variance was $19,800 unfavourable, and the actual variable overhead rate was $2.10 per direct labour hour.
The fixed overhead allocated was:
A) $300,000
B) $316,800
C) $288,000
D) $330,000
Correct Answer:

Verified
Correct Answer:
Verified
Q72: White, Inc. produces a chemical product
Q73: Baldwin, Inc uses a standard job cost
Q74: Standard costs are developed using:<br>A) This period's
Q75: Dem Mfg. has gathered the following
Q76: Given the following account balances at
Q78: Unattainable standards are likely to lead to:<br>I.
Q79: The production manager of CLR Corporation calculated
Q80: The difference between actual capacity used and
Q81: During the period Richeleau produced 1,000
Q82: The fixed overhead spending variance measures:<br>A) The