Multiple Choice
A company expected its annual overhead costs to be $1500000 and direct labor costs to be $1000000. Actual overhead was $1450000 and actual labor costs totaled $1100000. How much is the company's predetermined overhead rate to the nearest cent?
A) $1.45
B) $1.31
C) $1.50
D) $1.37
Correct Answer:

Verified
Correct Answer:
Verified