Multiple Choice
Which of the following correctly demonstrates the comparison of the four-variance method of factory overhead analysis to the two-variance method of factory overhead analysis?
A) The sum of the spending and budget variances in the four-variance method is equal to the controllable variance in the two-variance method.
B) The sum of the budget, spending and efficiency variances in the four-variance method is equal to the controllable variance in the two-variance method.
C) The sum of the spending, efficiency and volume variances in the four-variance method is equal to the controllable variance in the two-variance method.
D) The budget variance in the four-variance method is equal to the controllable variance in the two-variance method.
Correct Answer:

Verified
Correct Answer:
Verified
Q5: If the total materials variance (actual cost
Q12: Earl Company's direct labor costs for the
Q14: How should an efficiency variance that is
Q15: Which of the following terms best identifies
Q18: Hernandez Corporation uses a standard cost system
Q19: When performing input-output variance analysis in standard
Q19: Donellan Company has a standard and flexible
Q21: The Jurcevich Corporation manufactures and sells a
Q40: Characteristics of ideal standards include all of
Q70: Which of the following is not likely