One mistake that a study team can make when performing a systems analysis is to:
A) Perform a preliminary investigation first
B) Have employees participate in the systems study work
C) Utilize a "systems approach" in performing the systems study
D) Ignore the strong points of the present system
Correct Answer:

Verified
Correct Answer:
Verified