Multiple Choice
Earth Movers & Shakers operates 3 iron ore mines.The table below shows each mine's total daily production and the current number of miners at each mine.All miners work for the same wage, and each miner in any given mine produces the same number of tons per day as every other miner in that mine. Suppose Earth Movers & Shakers needs to fill an order for 60 tons of ore in a single day.If it has no other orders for that day, it should:
A) take it all from Mother Lode.
B) take it all from Middle Drift.
C) take 30 tons from Scraping Bottom and 30 tons from Middle Drift.
D) take 20 tons from each of the three mines.
Correct Answer:

Verified
Correct Answer:
Verified
Q4: You have noticed that your next-door neighbor,
Q53: Refer to the figure below.For Pat, the
Q54: Moe divides his time between studying Physics
Q58: Points that lie below the production possibilities
Q59: Lou and Alex live together and share
Q61: Refer to the table below.According to the
Q85: If a nation can produce a more
Q93: Suppose it takes Dan 5 minutes to
Q122: Suppose Colin brews beer and makes cheese.
Q138: Larry has a comparative advantage over his