Multiple Choice
The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead) based on 100% of normal capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows:
-The variable factory overhead controllable variance is
A) $12,000 unfavorable
B) $12,000 favorable
C) $14,000 unfavorable
D) $26,000 unfavorable
Correct Answer:

Verified
Correct Answer:
Verified
Q20: A budget performance report compares actual costs
Q21: The standard factory overhead rate is $10
Q23: Although favorable fixed factory overhead volume variances
Q24: If the standard to produce a given
Q26: The following data relate to direct labor
Q36: The controllable variance measures<br>A) operating results at
Q40: Match each of the following descriptions with
Q57: The total manufacturing cost variance consists of<br>A)
Q118: Which of the following is not a
Q144: Standard costs serve as a device for