Multiple Choice
The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhead and $1.30 for fixed factory overhead) based on 100% of normal capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows:
-Favorable volume variances may be harmful when
A) machine repairs cause work stoppages
B) supervisors fail to maintain an even flow of work
C) production in excess of normal capacity cannot be sold
D) all of these choices
Correct Answer:

Verified
Correct Answer:
Verified
Q10: Match each of the following formulas or
Q130: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2256/.jpg" alt=" -The direct labor
Q131: Which of the following conditions normally would
Q132: The standard costs and actual costs for
Q133: If the wage rate paid per hour
Q134: The following data relate to direct labor
Q137: The volume variance measures the use of
Q138: Using the following information, prepare a factory
Q141: Standard costs are used in companies for
Q163: Use this information to answer the questions