Multiple Choice
Kaumajet Factory produces two products: table lamps and desk lamps. It has two separate departments: Fabrication and Assembly. The factory overhead budget for the Fabrication Department is $550,000, using 500,000 direct labor hours. The factory overhead budget for the Assembly Department is $400,000, using 80,000 direct labor hours.
-If a table lamp requires 2 hours of fabrication and 1 hour of assembly, the amount of factory overhead that Kaumajet Factory will allocate to each unit of table lamp using the multiple production department factory overhead rate method with an allocation base of direct labor hours is
A) $6.33
B) $4.91
C) $5.00
D) $7.20
Correct Answer:

Verified
Correct Answer:
Verified
Q13: Blue Ridge Marketing Inc. manufactures two products,
Q14: Adirondack Marketing Inc. manufactures two products, A
Q15: When activity-based costing is used, the estimated
Q16: Panamint Systems Corporation is estimating activity costs
Q17: When a plantwide factory overhead rate is
Q19: Troglodyte University uses activity-based costing to assign
Q20: When activity-based costing is used, the number
Q21: Botosan Factory has budgeted factory overhead for
Q22: Kaumajet Factory produces two products: table lamps
Q23: Blue Ridge Marketing Inc. manufactures two products,