Multiple Choice
Solve the problem.
-A textile company has specific dyeing and drying times for its different cloths. A roll of Cloth A requires 55 minutes of dyeing time and 45 minutes of drying time. A roll of Cloth B requires 60 minutes of dyeing time and
30 minutes of drying time. The production division allocates 2280 minutes of dyeing time and 1560 minutes of
Drying time for the week. How many rolls of each cloth can be dyed and dried?
A) 13 rolls of Cloth A, 28 rolls of Cloth B
B) 24 rolls of Cloth A, 16 rolls of Cloth B
C) 2 rolls of Cloth A, 49 rolls of Cloth B
D) 13 rolls of Cloth A, 40 rolls of Cloth B
Correct Answer:

Verified
Correct Answer:
Verified
Q67: Graph the system of inequalities.<br>- <span
Q68: Solve the system of equations.<br>- <span
Q69: Solve.<br>-A couple have bought a new
Q70: Graph the system of inequalities.<br>- <span
Q71: Graph the system of inequalities.<br>- <span
Q73: Solve the system by graphing.<br>-3x +
Q74: If possible, solve the system of equations.
Q75: Solve using a system of three linear
Q76: Solve the problem.<br>-A twin-engined aircraft can fly
Q77: Find the solution to the system by